Science's First Exam

Moorings, Risers & Subsea Systems

系泊、立管与水下系统

Station-keeping systems, flexible pipes and subsea hardware that connect floating facilities to the seabed.

3 open problems

  1. Most important

    Closing the gap between observed and target mooring failure rates

    Why do observed mooring line failure rates of floating production facilities exceed the annual failure probabilities assumed in design codes by large factors, and can design, inspection and monitoring practices bring field failure rates down to the targeted level?

    Why it matters. Mooring failures can lead to riser rupture, spills and loss of facilities, and the mismatch indicates that some degradation mechanisms are missing from design methods.

  2. Priority 2

    Long-term behaviour of synthetic fibre moorings

    Can creep, stiffness evolution, abrasion and axial-compression fatigue of polyester, nylon and high-modulus polyethylene mooring ropes be predicted over 25 or more years of service from short-term tests, with validated models?

    Why it matters. Fibre ropes are essential for deepwater and shallow-water floating systems, but their long-term nonlinear behaviour limits design confidence.

  3. Priority 3

    Stress corrosion cracking of flexible pipe armour by CO2

    Can the onset and growth of CO2-induced stress corrosion cracking in the steel armour wires of flexible risers and flowlines be predicted from annulus conditions and detected nondestructively in service before failure?

    Why it matters. This degradation mode has caused unexpected failures of flexible pipes in high-CO2 fields and is difficult to inspect through the pipe layers.

Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.