Tailings & Mine Waste Engineering
尾矿与矿山废弃物工程
Storage, stabilization, reprocessing and long-term management of tailings and waste rock.
3 open problems
Most important
Filtered tailings at very high throughput
Can tailings from large concentrators (above about 100,000 tonnes per day) be dewatered and dry-stacked at costs comparable to conventional slurry impoundments, with stable stacks in wet climates?
Why it matters. Dry stacking would remove the catastrophic failure risk of large tailings dams, but filtration has been economic mainly at smaller scales.
Priority 2
Permanent prevention of acid mine drainage
Can sulfide-bearing waste rock and tailings be treated or placed so that acid and metalliferous drainage is prevented for centuries without active water treatment?
Why it matters. Acid drainage can persist for centuries after closure, creating long-term liabilities and environmental damage.
Priority 3
Economic recovery of critical metals from tailings
Can critical metals such as cobalt, rare earths, indium or tellurium be recovered from legacy tailings at above 50% of contained metal and at costs competitive with primary production?
Why it matters. Tailings hold large quantities of critical metals; reprocessing could add supply while reducing environmental legacy.