Science's First Exam

Production Engineering & Flow Assurance

采油工程与流动保障

Multiphase transport of produced fluids and prevention of hydrates, wax and other deposits in wells and pipelines.

3 open problems

  1. Most important

    Multiphase flow prediction in long subsea tiebacks

    Can flow regime, liquid holdup and pressure drop of gas-oil-water flow in long subsea tiebacks (above about 100 km) and hilly-terrain pipelines, including viscous oils and transient slugging, be predicted to within about 10% from mechanistic models?

    Why it matters. Long tiebacks to existing facilities are key to developing remote fields, but mechanistic models are calibrated on low-pressure laboratory data.

  2. Priority 2

    Predicting hydrate plug formation under transient conditions

    Can the time and location of gas hydrate plug formation during shutdown, restart and other transients be predicted from fluid composition and flow conditions, enabling risk-based operation with minimal inhibitor use?

    Why it matters. Hydrate prevention by thermodynamic inhibitors is costly and environmentally burdensome; predictive plugging models would allow hydrate management rather than avoidance.

  3. Priority 3

    Wax deposition and deposit aging

    Can the rate of wax deposition and the hardening of deposits over time in subsea pipelines be predicted to within about a factor of 1.5 from fluid properties, so that pigging schedules can be set without field trial and error?

    Why it matters. Wax deposits can block pipelines and strand pigs, and current models need field-specific tuning.

Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.