Small modular, fast-spectrum, molten-salt and high-temperature gas-cooled reactors and their deployment.

3 open problems

  1. Most important

    Cost and schedule control of new nuclear plants

    Can new reactors in high-income countries be built on schedule at overnight capital costs below about US$4,000 per kWe, through modular factory fabrication or standardized fleets?

    Why it matters. Cost overruns, not technical feasibility, are the main obstacle to large-scale expansion of nuclear power.

  2. Priority 2

    Long-term operation of molten-salt power reactors

    Can a molten-salt reactor of more than 100 MW thermal operate for at least five years with controlled fuel-salt chemistry, acceptable structural corrosion and manageable fission-product handling?

    Why it matters. Molten-salt reactors promise high temperature, passive safety and fuel flexibility, but have no long-duration power-scale operating record.

  3. Priority 3

    Commercially viable closed fast-reactor fuel cycle

    Can a fast-reactor fleet with recycling of plutonium and minor actinides operate commercially at electricity costs comparable to light-water reactors?

    Why it matters. Closing the fuel cycle would multiply the energy obtainable from uranium and reduce long-lived waste.