Laser- and pulsed-power-driven fusion pursued as a repetitively operated power source.

3 open problems

  1. Most important

    High-gain targets at repetition rate

    Can inertial fusion targets achieve gains above about 50 while being fired at around 10 Hz or more, with chamber clearing and target injection fast enough for continuous operation?

    Why it matters. Single-shot ignition has been achieved, but an inertial fusion power plant requires high gain at high repetition rate.

  2. Priority 2

    Efficient, durable drivers

    Can laser or pulsed-power drivers deliver megajoule-class energies at 10 Hz with wall-plug efficiency above 10% and component lifetimes of billions of shots?

    Why it matters. The product of driver efficiency and target gain must exceed about 10 for net electricity, which current drivers cannot achieve.

  3. Priority 3

    Low-cost mass-produced targets

    Can fusion targets meeting ignition-grade precision be mass-produced at a cost below about one US dollar each, at rates of nearly a million per day?

    Why it matters. Current targets are hand-made at costs many orders of magnitude too high for power production.

Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.