Fusion Power Plant Integration

聚变电站集成

Whole-plant design of magnetic-confinement fusion power plants, including magnets, heating systems, availability and maintenance.

3 open problems

  1. Most important

    Sustained net engineering gain

    Can a fusion device produce more electricity than the total electricity consumed by the plant (engineering gain Q_eng > 1), sustained for periods of hours or longer?

    Why it matters. Net electricity from fusion would establish it as a practical energy source rather than a scientific experiment.

  2. Priority 2

    Reactor-relevant availability with remote maintenance

    Can a fusion power plant achieve availability above about 70%, given that in-vessel components exposed to neutrons must be replaced entirely by remote handling within weeks?

    Why it matters. The economics of fusion depend as much on availability as on gain, and maintenance of activated components is largely undemonstrated.

  3. Priority 3

    Reliable high-field superconducting magnets for power plants

    Can high-temperature-superconductor magnets producing fields above about 12 T on plasma operate for the lifetime of a power plant with reliable quench detection and protection, under neutron irradiation and cyclic loads?

    Why it matters. High-field magnets enable compact devices, but undetected quenches and radiation damage could destroy them and halt plant operation.