Desalination & Brine Management

海水淡化与浓盐水处理

Reverse osmosis, thermal and emerging desalination processes and treatment of their brines.

3 open problems

  1. Most important

    Desalination close to the thermodynamic minimum

    Can seawater desalination plants achieve total specific energy consumption within about 1.5 times the thermodynamic minimum (about 1.1 kWh/m³ at 50% recovery), including pretreatment and intake?

    Why it matters. Energy is the largest operating cost of desalination and a growing source of emissions as capacity expands.

  2. Priority 2

    Affordable zero-liquid-discharge brine management

    Can inland and seawater desalination brines be concentrated to dryness or valorized at costs and energy use comparable to the desalination itself?

    Why it matters. Brine disposal limits inland desalination and causes local marine impacts.

  3. Priority 3

    Fouling-resistant desalination membranes

    Can reverse-osmosis membranes resist biofouling and chlorine degradation so that they operate for years with minimal pretreatment and no loss in salt rejection?

    Why it matters. Fouling and pretreatment add substantially to the cost and complexity of desalination.