Science's First Exam

Climate-Adaptive Infrastructure Design

气候适应性基础设施设计

Engineering design under nonstationary climate hazards such as floods, heat and sea-level rise.

3 open problems

  1. Most important

    Design floods under nonstationarity

    Can design flood magnitudes for return periods of 100 years or more be estimated under a changing climate with uncertainty bounds narrow enough for engineering design?

    Why it matters. Design standards assume a stationary climate, which is no longer valid.

  2. Priority 2

    Adaptive design pathways for long-lived infrastructure

    Can a decision framework for infrastructure design under deep climate uncertainty be shown to reduce life-cycle cost and failure risk compared with conventional design?

    Why it matters. Infrastructure built today must perform for many decades under uncertain future climates.

  3. Priority 3

    Compound hazard design loads

    Can joint probabilities and combined loads from compound events, such as storm surge with heavy rainfall or heat with drought, be characterized well enough to set design criteria?

    Why it matters. Compound events cause disproportionate damage but are largely absent from design codes.

Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.