Science's First Exam

Process Control & Operations

过程控制与运行

Model predictive control, monitoring, scheduling and real-time optimization of process plants.

3 open problems

  1. Most important

    Integrated scheduling and control

    Can production scheduling and dynamic control of large multiproduct plants be optimized jointly in real time with guaranteed feasibility under disturbances?

    Why it matters. Separating scheduling and control leads to infeasible schedules and lost profit, especially for flexible, electrified plants.

  2. Priority 2

    Economic model predictive control with guarantees

    Can economic model predictive control of large nonlinear plants be implemented with guaranteed stability and constraint satisfaction under model mismatch, at real-time speeds?

    Why it matters. Controlling directly for economic objectives could improve plant profit, but lacks guarantees operators can trust.

  3. Priority 3

    Early detection of abnormal events

    Can process monitoring detect and diagnose incipient faults in large plants early enough to prevent incidents, with false-alarm rates low enough that operators trust alarms?

    Why it matters. Abnormal situations cost the process industry billions annually and contribute to major accidents.

Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.