Earthquake Forecasting & Hazard
地震预测与灾害评估
Statistical and physical forecasting of earthquake occurrence, size and shaking for seismic hazard assessment.
3 open problems
Most important
Deterministic short-term earthquake prediction
Can the time, location and magnitude of a damaging earthquake be predicted days to weeks in advance with a skill significantly exceeding statistical clustering models (e.g. ETAS), using any precursory physical signal?
Why it matters. Reliable prediction would save many lives; demonstrating impossibility would redirect resources toward early warning and resilience.
Priority 2
Determinism of earthquake magnitude at rupture onset
Is the final magnitude of an earthquake encoded in its first few seconds of rupture (deterministic nucleation), or does rupture grow as a cascade whose final size is set only by fault conditions encountered during propagation?
Why it matters. The answer sets the fundamental limit on earthquake early warning for great earthquakes.
Priority 3
Maximum magnitude of subduction megathrusts
Which subduction zones can host Mw ≥ 9 earthquakes, and what properties (sediment input, plate roughness, convergence rate, slab geometry) control maximum rupture length and the occurrence of supercycles?
Why it matters. Tohoku 2011 exceeded the assumed maximum magnitude; a physical basis for Mmax is required for tsunami and seismic hazard planning.
Problem lists are drafts awaiting expert review. The taxonomy is our own and is not affiliated with any journal or publisher. Read our approach.